Velodrome - London 2012 Olympic Venue

July 5, 2010

The instruction from the client was to survey the structural steel frame and recently installed Lufftrack between the back of the stadium seating and the underside of the roof. Mesh Screens/Panels were designed to cover this space (see pic below for finished installed panels). Due to the design of the stadium design no two panels were the same so the stadium had to be surveyed all the way around. Base then took our Survey and manufactured each panel to mm accuracy. A section of the survey can be seen below:

 

 

 

 

 

Please reload

Featured Posts

No. 1 Lewins Mead, Bristol

August 15, 2016

1/3
Please reload

Recent Posts

October 11, 2019

November 24, 2017

September 8, 2015

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2015 by Lansdowne Surveys. Proudly created with Wix.com

  • Facebook Basic Black
  • Twitter Basic Black
  • LinkedIn Basic Black