Directional Drill, Profile Survey

September 11, 2014

 

Despite all the hi-tech equipment at our disposal, there are still times when you just need to wade into a river with a staff and stand there while your colleague takes a reading. As you can see this was the case when Lansdowne were surveying along a proposed new cable route for a new solar farm in Wiltshire. 

 

The design engineers determined that a directional drill would need to bore beneath the river from one side to the other; a survey was completed, and from that a profile of the river, banks and surrounding area was generated (see both below).

 

 

 

 

Please reload

Featured Posts

No. 1 Lewins Mead, Bristol

August 15, 2016

1/3
Please reload

Recent Posts

October 11, 2019

November 24, 2017

September 8, 2015

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2015 by Lansdowne Surveys. Proudly created with Wix.com

  • Facebook Basic Black
  • Twitter Basic Black
  • LinkedIn Basic Black