Selly Oak, Birmingham

November 24, 2017

Main contractor Interserve are currently constructing a Sainsbury's supermarket, student accommodation block and several retail warehouse units in Selly Oak Birmingham.

 

above: a cage vibrator being used to install a full length 14m cage to a contig wall bearing pile

 

 

Lansdowne are undertaking the setting-out of the piles for client Cementation Skanska. Three rigs are currently installing the CFA piles. Lansdowne duties include generating pile co-ordinates from design drawings, setting-out, levelling cages and finally producing as-builts and red line drawings.

 

above: asbestos protection suits & masks being worn by piling operatives

 

 

 

 

 

Please reload

Featured Posts

No. 1 Lewins Mead, Bristol

August 15, 2016

1/3
Please reload

Recent Posts

October 11, 2019

November 24, 2017

September 8, 2015

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2015 by Lansdowne Surveys. Proudly created with Wix.com

  • Facebook Basic Black
  • Twitter Basic Black
  • LinkedIn Basic Black