Piling
the calculaton, Setting-out and as-built of 13,000 piles... Over an 18mnth period three Lansdowne engineers were responsible for the calculation of and setting-out of 13,000 piles (pre-cast driven, cfa and ldp) at the Westfield Stratford City project. The shopping centre itself is siuated btwn the Stratford Bus, tube & train stations an d the London 2012 Olympic Park in the very heart of Stratford, East London. The engineers were embedded into the Balfour Beatty Ground Engine