top of page

Land, Building & 3D Surveys. Site Engineering.


As-Built Survey
the final As-Built... It’s believed Phoenix Engineering have been involved with more Leachate Treatment Plants than any other...


Slab Survey
a before & after concrete slab survey... The Bristol Port Company requested a Level Survey across a concrete slab in one of their...


Velodrome - London 2012 Olympic Venue
The instruction from the client was to survey the structural steel frame and recently installed Lufftrack between the back of the stadium...


Basketball Arena - London 2012 Olympic Venue
Ironing out the wrinkes... As you can see from the pic above the steel frame has a high tensile fabric material stretched over it....


Piling
the calculaton, Setting-out and as-built of 13,000 piles... Over an 18mnth period three Lansdowne engineers were responsible for the...


Rail Survey
Sections through the railway.. Following an embankment slip, a section of railway (two lines) in Somerset had been re-modelled, the...


Monitoring in the marina..
As part of the Meridian Quay development in Swansea the client, contractor and local council required the dock wall of the neighbouring...


Volume Calculations
Volume calculations are a common request from many of our sub and main contractor clients. For example the mound below was calculated for...
Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
bottom of page





























