Halo, Bristol
- Jay Wheeler, Steve Lansdowne
- May 6
- 1 min read
Updated: May 7

The Halo Building is a prominent office development located in Bristol's Finzels Reach area. Constructed by Willmott Dixon and completed in 2022, it offers 116,133 sq ft of Grade A office space across seven floors. Designed with a strong emphasis on sustainability, Halo achieved BREEAM Outstanding certification, making it one of the UK's most environmentally advanced office buildings.
Key features of the Halo Building include:
Sustainable Design: Halo incorporates various eco-friendly initiatives, such as connection to Bristol's district heating network and energy generation from descending lifts, resulting in a 35% reduction in energy consumption and a 47% decrease in carbon emissions compared to standard buildings.
Modern Amenities: The building boasts a double-height reception, a full-height central atrium with a helical staircase, advanced smart technology systems, and a rooftop drone landing pad.
Occupancy: Major tenants include international law firm Osborne Clarke and Deloitte, both of which have committed significant office space within Halo.
Developed by Cubex Land, Halo contributes significantly to the regeneration of the Finzels Reach neighbourhood, enhancing Bristol's reputation as a hub for sustainable and innovative office spaces.
Our involvement in this project for various contractors included:
Establishing the original site station control
Topographical surveys
Setting out and line and level surveys the steel frame
Setting out gridlines and datums throughout the project
Working closely with the glazing contractor to set out the curtain walling
Setting out of the stone cladding
Surveying and setting out for architectural steel. feature spiral staircase and balustrading
Quality assurance on various aspects of the project