The Crescent, Bristol
- Jay Wheeler
- May 6
- 1 min read

The Crescent Centre, located at Temple Back in Bristol, underwent a significant redevelopment led by Kier Construction. This £28 million project, initiated in October 2022 and completed in June 2024, transformed the existing office space into a modern, sustainable workspace known as Crescent.
Key features of the redevelopment include:
Structural Enhancements: The project involved retaining and upgrading the building's existing structure, resulting in a 45% reduction in upfront embodied carbon compared to new construction.
Expanded Workspace: The redevelopment increased the lettable office space to 101,000 sq ft, offering flexible floor plates ranging from 1,600 sq ft to 18,000 sq ft.
Modern Amenities: Crescent now features a range of amenities, including a café with an external decked area, a gym and fitness studio, secure cycle parking for 164 cycles with repair facilities, and three private roof terraces offering views over Temple Gardens.
Sustainability Initiatives: The building has achieved BREEAM Excellent and EPC A ratings and operates as a Net Zero Carbon facility, incorporating energy-efficient heating and cooling systems.
Designed by Buckley Gray Yeoman, Crescent exemplifies a commitment to sustainability and modern workspace design, providing a healthier and more flexible environment for its occupants.
Our involvement on this project included:
Setting out the steel frame at roof level and ensuring the frame was plumb, lined and levelled within tolerance.
Setting out of gridlines and datums throughout the project.
Setting out slab penetrations for M&E.
Setting out the atrium steel.
Various surveys for quality assurance.