132kV Substation, World's End Solar Farm, Gloucestershire
- Steve Lansdowne
- May 13
- 1 min read

Client / Contractor: CPM Civil Engineering
Location: Gloucestershire
Status: Current
Category: Energy / Infrastructure
Value: Not specified
Summary:
Lansdowne Surveys delivered comprehensive surveying and setting out services for the construction of a 132kV substation at the World's End Solar Farm in Gloucestershire — one of the most precision-critical environments in civil construction.
Full Description:
Lansdowne Surveys Limited was engaged by CPM Civil Engineering to deliver all site surveying and setting out services for the construction of the 132kV substation at the World's End Solar Farm in Gloucestershire.
Key responsibilities included: establishment and maintenance of primary and secondary site control networks; high-precision setting out of transformer and plant foundations, equipment bases, structural elements, cable routes, trenches and ducting systems; verification of formation levels and foundation depths; continuous as-built surveys to validate completed works against design specifications; monitoring dimensional accuracy; and providing survey data and reports for quality assurance and project records.
Working closely with CPM Civil Engineering, Lansdowne's proactive coordination ensured all civil elements were delivered in the correct position and level, reducing rework risk and supporting seamless progression into the electrical installation phase.
Services Delivered: Site Setting Out, As-Built Surveys, Control Network Establishment, QA Reporting