North Dairy Solar Farm Substation
- Steve Lansdowne
- May 13
- 1 min read

Client / Contractor: CPM Civil Engineering
Location: North Dairy Solar Farm (location TBC — confirm with Steve)
Status: Current
Category: Energy / Infrastructure
Value: Not specified
Summary:
Lansdowne Surveys delivered all site surveying and setting out services for the construction of the grid connection infrastructure at North Dairy Solar Farm — a substation and associated civils works enabling export of renewable energy to the electricity network.
Full Description:
Lansdowne Surveys Limited was engaged by CPM Civil Engineering to deliver all site surveying and setting out services for the construction of the grid connection infrastructure at the North Dairy Solar Farm. The project required high-voltage infrastructure to facilitate the export of renewable energy to the electricity network, centred on a substation and associated civils works.
Key responsibilities included: establishment and maintenance of primary and secondary site control networks; high-precision setting out of transformer and plant foundations, equipment bases, cable routes, trenches and ducting systems; setting out of access roads; verification of formation levels and foundation depths; continuous as-built surveys; and monitoring and quality control to ensure compliance with engineering tolerances.
Lansdowne's proactive setting out ensured all elements were constructed in the correct position and level, supporting a smooth transition into the electrical installation phase.
Services Delivered: Site Setting Out, As-Built Surveys, Control Network Establishment, Formation Level Verification