top of page
logo
GET A QUOTE

Request
quote

we respond fast

Whether you need a topographical survey, point cloud scan or site engineering support, get in touch and we'll respond quickly with a competitive quote.

LinkedIn

Lansdowne Surveys

Based

England — Nationwide Coverage

// Enquiry Form

Service Required

Temple Quarter Enterprise Campus, Bristol

  • Steve Lansdowne
  • May 13
  • 1 min read

Client / Contractor: Taunton Fabrications / Bygott Ltd / Elland Steel Structures / MJ Patch

End Client: University of Bristol

Location: Bristol

Status: Completed

Category: Education / Commercial

Value: Not specified


Summary:

Lansdowne Surveys played a significant role in the delivery of the Temple Quarter Enterprise Campus — a major new development for the University of Bristol transforming a key part of the city into a state-of-the-art academic campus.


Full Description:

Working alongside Taunton Fabrications, Lansdowne Surveys was responsible for the precise setting out of multiple feature staircases and hundreds of structural steel goalposts across the development. Their involvement also extended to collaboration with Bygott Ltd and Elland Steel Structures, undertaking setting out and as-built surveying of complex steelwork installations at roof level. They also worked with MJ Patch to survey and set out hundreds of metres of external and internal balustrades.


Services Delivered: Site Setting Out, As-Built Surveys, Structural Steel Setting Out



 
 
bottom of page